Built from plant, supplier and purchase-order data: an orchestrated runtime that chains graph/query, shortage recommendation and read-only PO intelligence tools. Every run is validated, evidence-bound and routed to a human when risk or uncertainty requires it.
Existing ERP and plant systems remain authoritative. The intelligence layer is read-only, keeps evidence attached and proposes actions rather than silently changing source systems.
User question, shortage event, PO exception or analyst prompt.
Intent, typed parameters and allowed ontology paths.
Graph/query, shortage and PO tools selected in the required order.
Claims cite the facts, records and caveats behind them.
Human gate where needed, then an auditable run record.
Multi-step classification, ontology validation, traversal, evidence binding and recommendation.
Returns a justified partial answer or refuses when required evidence is not available.
Read-only deployment with no write credentials, schema mutation or ERP interruption.
Built around part, supplier, weekly position, PO, shortage, provenance and caveat relationships.
The orchestrator takes a trigger - a user question, shortage event, PO exception or manual analyst prompt - decides which tools apply and in what order, chains them, and never finalizes high-risk or low-confidence output without a human.
Picks and orders the graph/query, shortage and PO tools per trigger type.
Records trigger, tools called, inputs, outputs, evidence, caveats, sign-off state and outcome.
Returns a justified partial result or a refusal when a required tool cannot answer.
Escalates high-risk or low-confidence output before it is treated as final.
Classifies intent, validates traversal plans, executes over connected facts and binds evidence—or refuses.
Ranks shortages by actionability, reasons over supplier and assembly context, and proposes next steps.
Flags duplicate demand, variance and match exceptions deterministically, then drafts evidence-only rationale.
parts · 288 assemblies · 282 vendors
9,400 used-in edges, 5,300 supplied-by edges, 446 fields, 83 caveats and 215 evidence nodes.
weekly position records
Per-part thresholds and ranking based on first breach, duration and depth rather than a single global rule.
deployment model
Cross-plant demand consolidation, supplier-history benchmarks and buyer-facing rationale beside the ERP.
The value is not only automation speed. The layer must be explainable to operations, acceptable to IT and controlled enough for procurement teams to use in real review cycles.
Connects to approved extracts, APIs or replicas first. Existing ERP screens, approvals and master data remain authoritative, while the intelligence layer creates recommendations and review packets.
Outputs can reference source collection, field, record key, relationship, caveat and load state so a planner, buyer or analyst can inspect why the system reached a conclusion.
Deterministic checks handle duplicate demand, variance, thresholds and known relationships. Model steps are limited to classification, extraction, explanation and rationale over validated context.
High-impact or low-confidence recommendations route to a human gate. Each run leaves an episode record: trigger, tools called, inputs, evidence, caveats, approval state and outcome.
Switch views to follow the market story: a connected operating graph, faster shortage decisions, buyer-ready PO rationale and governed human approval.
Plant, supplier, inventory and PO facts stay connected so the AI layer can cite its work, expose caveats and escalate high-impact decisions.
Each case is framed as a field pattern: the decision a buyer needs to improve, the evidence required, the operating gain and the control that keeps it enterprise-safe.
A plant asks which assemblies, POs and suppliers are exposed by a part or vendor risk. Instead of chasing spreadsheets and tribal memory, the graph/query layer traverses approved relationships, attaches source records and clearly refuses paths the ontology does not support.
The shortage case turns weekly positions into action-ranked exceptions. It considers first breach, shortage depth, duration, lead-time reality and supplier context, then proposes the next best action for planner review.
The PO case flags duplicate demand, price variance, supplier-history mismatch and match exceptions deterministically. The AI layer then drafts buyer-ready rationale from those facts only, with no automatic write-back.
The graph query, shortage recommendation and PO intelligence flows use the same operating contract: understand the request, verify it against supported business relationships, use approved evidence and preserve a review trail.
Identify whether the trigger is a question, shortage event, PO exception or analyst request.
Confirm the entities, relationships and fields are supported before any answer is composed.
Pull only records, caveats, thresholds and relationship facts that can be cited back to source.
Separate low-risk answers from recommendations that need buyer, planner or manager approval.
Store the trigger, tool path, evidence, confidence, refusal reason or approval outcome.
Adoption starts with a narrow workflow where the business owner can see time saved, risk reduced or review quality improved. Expansion happens only after the evidence, controls and outcome are accepted.
Select one repeatable decision such as supplier impact, shortage triage or PO review. Confirm available records, ownership, caveats and approval points before solution design.
Run the workflow against a limited plant, category or buyer queue. Measure answer quality, triage lift, review time and refusal behavior against agreed acceptance criteria.
Package the validated flow for your environment: read-only integrations, run logs, role-based review gates, support ownership and a clear path for adding the next use case.
Use the tabs to review how a supplier-impact question, shortage queue, PO review or cross-module reasoning cycle would run. The first workflow is visible by default so the proof surface is clear on arrival.